Non-productive time (NPT) is a major cost driver in coiled tubing (CT) operations, often caused by human error, equipment failures, or inefficient procedures. Portable coiled tubing simulators he...
Coiled tubing (CT) operations are critical in well intervention, drilling, and completions. To optimize performance and reduce risks, engineers rely on coiled tubing simulator software. Several s...
The north america coiled tubing market size was valued at USD 1,674.3 million in 2023 and is poised to grow at CAGR X% during the forecast period 2024-2030. The growth of the market is majorly dr...
Posted by esimtech on September 27 2023 at 03:12 AM
public
Coiled tubing, a flexible pipe wound on a massive reel, has become indispensable for well intervention and production enhancement in the oil and gas industry. However, the complexity of coiled tubi...